Gunnison Bridge Replacement |
| Print | |
E-mail |
|
Stuctural Concrete
|
|
In Fall 2008, Meza Construction removed the existing bridge and steel support piles on Road 149, 6 miles north of Lake City. New concrete abutments and a custom wooden truss bridge from Oregon were installed in Spring 2008. Meza completed access road improvments and new site signage for this BLM project. {em_slideshow 16} |
|
Design/Build
|
|
A permeable paver system with open-graded aggregate was installed in this residential driveway. Open-graded aggregate uses layers of aggregate for structural loading as well as stormwater infiltration. The existing driveway was removed and material below the concrete was removed. {em_slideshow 21} |
|
Read more...
|
|
Stuctural Concrete
|
|
Meza is building the pedestrian bridges for the FasTracks - West Corridor. Read more in this RTD newsletter. |
|
Flatwork
|
|
More information and pictures coming soon! |